Preflex Parking Garage for a hospital

In Gießen, we erected a Preflex® Parking Garage with a mezzanine floor for the first time, a so-called split-level parking garage.

The assembly of the 5 mezzanine floors made from 130 prefabricated Preflex® panel elements took just 3 weeks. Including the preparatory work, a total of about two and a half months passed until completion with facade and marking work as well as equipment with parking guidance system and charging infrastructure. As a result, the Evangelisches Krankenhaus Mittelhessen now has 315 additional parking spaces at its disposal.

In addition, at the contract location, we topped up the existing parking garage of another supplier with our Preflex® system on two weekends during ongoing parking operations and were thus able to create another 38 parking spaces.

Bauherr Developer Agaplesion Evangelisches Krankenhaus Mittelhessen gGmbH
Leistung Service Preflex® Parkhaus
Place of construction Wiesbaden, Hesse
Tonnage 250 t

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

PREFLEX® Parking Garage.

This modular parking system creates additional parking space in no time at all – regardless of whether its 10, 100 or 1,000 parking spaces. Realizable in the form of a purchase, rental or lease model!

Read more

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more