Plant steel for pulp press

To ensure that sugar and powdered sugar ultimately find their way into households, we supplied structural steelwork for plants for the new pulp press station at the Nordzucker plant in Nordstemmen, Lower Saxony. We manufactured a total of 277 tons of steel to a precise fit in our own production facilities and assembled it on site.

The project, which fell entirely within the logistically challenging period of the Corona pandemic, was divided into various sections. The largest part was the new steel enclosure of the pulp press station, and the connection to cable route bridges was also supplied. Long walkways were also constructed to connect the old plant and existing buildings to the new structure, and a new platform was built at the pulp feed hopper in the existing building.

The railings for the new walkways alone amounted to 750 meters, and 850 square meters of gratings ensure good footing on the new plant.

Bauherr Developer Nordzucker AG
Leistung Service Structural Steelwork
Tonnage 277 t
Place of construction Nordstemmen, Lower Saxony

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more

About C + P.

CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.

Read more