Footbridge over the A7 motorway

According to the order, we created a haunched single-span frame with a curved lower edge for the “Pelzkappe” forest overpass on the A7 motorway. The entire steel superstructure is 55.7 meters long and weighs 120 tons.

We transported the steel structure in two shots to the construction site in Schondra, Bavaria, 380 kilometers away. There, the two halves were then welded together at the top and coated with a topcoat. After only eight hours of nightly work, the superstructure was already in place.

Bilder: Tom Bauer Ad Photography

Bauherr Developer Autobahndirektion Nordbayern
Leistung Service Bridge Building
Place of construction Schondra, Bavaria
Tonnage 120 t

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Bridge Building.

We assume responsibility for planning, manufacture and assembly of bridge building projects and are capable of delivering within extremely short construction times, thanks to in-house production and innovative solutions.

Read more

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more