New loading building for building materials

For a building materials manufacturer, we constructed a new loading facility. This was a classic project in the field of structural steelwork for plants, for which we fabricated and erected a total of 120 tons of steel.

The building measures 14 meters in length and 9 meters in width. With a height of 20 meters, it provides sufficient clearance for vehicles transporting building materials.

In addition to the steel structure, our scope of services included the installation of the roof and façade as well as the gratings.

Bauherr Developer Rheinkalk GmbH
Leistung Service Structural Steelwork
Tonnage 120 t
Place of construction Wülfrath, Northrhine-Westfalia

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more

About C + P.

CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.

Read more